Passenger Boarding Bridges for Airport

Date
2017
Services
Engineering, delivery and on-site installation

TTS has fully implemented the production of metal structures and the assembly of passenger boarding bridges according to the customer’s drawings. Assembly works included electricians, hydraulics, glazing and installation of other components.

This type of production was produced in 2017 by TTS for the first time.

  • Length: 16,8 m
  • Width: 3,8 m
  • Height: 4 m
  • Total weight >28 t